国产精品久久久久免费视频_天天综合网天天综合色不卡_国产精品一区久久久_色爱区综合激月婷婷激情五月_免费在线观看a级片_免费无码AV色情在线

Conveyor switch

Bidirectional pull switch

The bidirectional pull switch is a bidirectional action, and pull ropes can be installed on both sides of the switch. When the belt conveyor equipment malfunctions, on-site workers pull the ropes on both sides of the bidirectional pull rope switch, causing the cam inside the switch to press the micro switch and put the switch into working mode, issuing a shutdown signal to prevent and control the equipment and personnel.

  • HFKLT2-II
  • ZHUOXIN
  • 24V-380V
  • IP67
  • TT, PayPal, Credit card, Western union
  • +86-15163766288
  • The bidirectional pull switch is widely used in various fields such as metallurgy, coal, cement building materials, mining, power, ports, metallurgy, chemical engineering, etc., including conventional belt conveyors, underground cable support belt conveyors, ship loading and unloading systems, stacking/reclaiming conveyors, inclined and shuttle conveyors, cranes, excavators, boom limiters, skirt feeders, and other types of conveyors.

Description

Conveyor switch







Bidirectional pull switch HFKLT2-II

The bidirectional pull wire switch HFKLT2-II is a protective switch that achieves emergency shutdown of the system in the event of an accident during the operation of a tape conveyor, protecting personnel or equipment< Br/>
1、 Overview
The bidirectional pull switch HFKLT2-II (i.e. pull rope switch, emergency stop switch) adopts an integral seal, which has the characteristics of waterproof, moisture-proof, dustproof, etc., and is suitable for use in harsh indoor and outdoor environments with high humidity and dust< Br/>




2、 Main use

This series of products is a protective switch for emergency shutdown of the system in case of accidents during the operation of tape conveyors, protecting personnel or equipment< Br/>
3、 Main technical indicators
Working voltage& Nbsp& Nbsp; AC220V

Action angle& Nbsp& Nbsp; 25< Br/>
Contact capacity& Nbsp& Nbsp; AC220V; 3A

Extreme angle& Nbsp& Nbsp; 75< Br/>
Contact form& Nbsp& Nbsp; Double breakpoint 1 normally open and 1 normally closed

Protection level& Nbsp& Nbsp; IP65

Service life& Nbsp& Nbsp; 100000 times

Re & Nbsp; Quantity& Nbsp& Nbsp; 2.5Kg





4、 External structure and working principle

1. Appearance structure

2. Working principle

This product is a bidirectional action, and pull ropes can be installed on both sides of the switch. When the belt conveyor equipment malfunctions, on-site workers pull the ropes on both sides of the bidirectional pull rope switch, causing the cam inside the switch to press the micro switch and put the switch into working mode, issuing a shutdown signal to prevent and control the equipment and personnel< Br/>




5、 Installation and wiring
(1)   Installation
Users can create a self-made installation bracket based on the installation dimensions indicated by the external structure, or they can order it from our company. Fix the switches on both sides of the tape machine, install them in pairs, and meet the following requirements:

1.  During installation, the product should be positioned below the tape (its height should be convenient for on-site personnel to use) and fixed on both sides of the tape conveyor along the line. The distance between each pull rope switch should be around 40 meters< Br/>
2.  Tie the pull rope to the swing arm of the switch body, fix it with a rope clip, and first install support rings on both sides of the switch nearby. Then install support rings every 3 meters to avoid excessive deflection and ensure the normal use of the switch< Br/>
3.  Under the premise of ensuring normal operation of the switch, try to tighten the ropes on both sides as much as possible and minimize the vertical deflection of the rope< Br/>
4.  For slope tape machines, the length of the pulling rope and the switching distance should be shortened as appropriate< Br/>
(1)   Wiring
Lead out a four core rubber sleeve cable at the outlet, which is red, blue, yellow, and black. Among them, red and blue are the outgoing lines of the dynamic break point. Yellow and black represent the outgoing lines of the dynamic closing contact. The wiring principle is shown in Figure (4)

6、 Maintenance and upkeep
1.  Regular dust removal, regular inspection of switch contact conversion status to ensure normal operation< Br/>
2.  If the machinery or steel wire rope is severely rusted, it should be replaced in a timely manner< Br/>


&Nbsp;

Tags

Get the latest price? We'll respond as soon as possible(within 12 hours)
主站蜘蛛池模板: 色综合天天综合网国产成人网 | 99久久精品国产亚洲 | 高校处世王 | 手机看片高清日韩精品 | 黄色成人av| 日韩欧美一级大片 | 国产在线看片 | 国产 福利 在线 | 九九99国产精品视频 | 成人黄色在线 | 日日碰| 欧美三级视频在线观看 | 国产97色在线 | 日韩 | 亚洲欧美综合网 | 午夜你懂得 | 日韩日韩日韩日韩 | 就去色成人网 | 久久人人做 | 免费精品美女久久久久久久久久 | 亚洲jizzjizz妇女 | 日本精品久久久久中文字幕2 | 午夜精品久久久久久久99蜜桃i | 91欧美精品综合在线观看 | 一区二区三区波多野结衣 | 精品视频网站 | 天天拍天天色 | 国产在视频一区二区三区吞精 | 欧美视频三区 | 中文字幕三区 | 亚洲精品乱码久久久久久蜜桃91 | 久久男人视频 | 成人午夜网站 | 免费av大全 | 操操片| 免费观看一级特黄欧美大片 | 久久美女性网 | 成人国产精品 | 亚洲天天做日日做天天看2018 | 欧美高清在线视频一区二区 | 免费黄色大片在线观看 | 国产高清视频在线 |